Rock Drilling


 


             

PESHTIGO RIVER CROSSING

 

Who:     City of Peshtigo

 

Where:  Peshtigo, Wisconsin

 

When:   June, 2008

 

Size:     $330,000.00

Project History #148

 

EBI was awarded a contract from the City of Peshtigo for the installation, by directional drilling, of a 12-inch HDPE DIPS water main for the Peshtigo River Crossing Project in Peshtigo, Wisconsin. The project was originally bid as one 1,000’ shot in dirt across the Peshtigo River. The crossing turned into a rock bore as bedrock was encountered during the initial drill out.

 

 

Owner: Engineer:

City of Peshtigo

 

Steve Cota
401 E. Front Rd.
Peshtigo, WI 54035
920 582-4321

Mead & Hunt

 

Scott Brosteau
1345-B North Rd.
Green Bay, WI 54313
920 496-0500

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

HWY 74 WATER MAIN EXTENSION

 

Who:     Wondra Construction

 

Where:  Lannon, Wisconsin

 

When:   April, 2008

 

Size:     $106,000.00

Project History #147

 

EBI was awarded a subcontract from Wondra Construction for the installation, by directional drilling, of a 12-inch HDPE DIPS water main for the Highway 74 Water Main Extension Project in Lannon, Wisconsin. Two shots were completed on the project including a 291’ installation through bedrock.

 

 

 

Contractor: Engineer: 

Wondra Construction

 

Russel Wood
W. 2874 Graylog Rd.
Iron Ridge, WI 53035
920 587-5870

Ruekert/Mielke

 

Kevin Contardi
W. 233 N. 2080 Ridgeview Pkwy.
Waukesha, WI 53188-1020
262 542-5733 

 

 

 

 

 

 

 

 

 

 

 

  


 

             

JACKFISH BAY WASTE WATER COLLECTION

 

Who:     Wagner Construction

 

Where:  Rainy Lake, Minnesota

 

When:   May, 2005 - June, 2006

 

Size:     $500,000.00

 

Project History #103

 

EBI was awarded a subcontract from Wagner Construction for the installation by directional drilling  of various sizes of HDPE force main as part of the Jackfish Bay Waste Water Collection System Project on Rainy Lake near International Falls, Minnesota. The dirt drilling totaled approximately 42,000’ of 1.5", 2”, 3”, 4” and 6” HDPE pipe. EBI also completed approximately 10,000’ of rock drilling for the project using a downhole air hammer.

 

 

Contractor: Engineer:

Wagner Construction

 

300 Van Lynn Road
S. International Falls, MN 56679
Kalan Wagner
218 283-3700

Benchmark Engineering

 

231 6th Ave. SW
Chisholm, MN 55719
218 254-5793