Lake Crossings


 


             

2009 WATER SYSTEM IMPROVEMENTS 

 

Who:     Brian Nettleton Excavating

 

Where:  Nashua, Iowa

 

When:   December 2010

 

Size:     $120,000.00

Project History #188

 

EBI was awarded a subcontract from Brian Nettleton Excavating for the installation, by directional drilling, of a 12-inch DIPS HDPE water main across Cedar Lake as part of the 2009 Water System Improvements Project in Nashua, Iowa. One shot totalling 1,400 feet was completed with 800 feet of it across Cedar Lake. The bore went through approximately 474 feet of limestone.

 

 

 

Contractor: Engineer:

Brian Nettleton Excavating

 

Brian Nettleton
269 370th St.
Joice, IA 50446
641 797-2850

TeKippe Engineering

 

George TeKippe
128 S. Vine St.
West Union, IA 52175
563 422-5131

 

 

 

 

 

 

 

 

 

 

 


 

 


             

LIFT STATION #2 REPLACEMENT & SANITARY SEWER FORCE MAIN

 

Who:     Winona Mechanical, Inc.

 

Where:  Galesville, Wisconsin

 

When:   December 2010

 

Size:     $88,000.00

Project History #187

 

EBI was awarded a subcontract from Winona Mechanical for the installation, by directional drilling, of 6-inch DIPS HDPE force main as part of the Lift Station #2 Replacement & Sanitary Sewer Force Main Project in Galesville, Wisconsin. A total of 2,020 feet  of the 6-inch force main was installed in one shot across Lake Marinuka.

 

 

 

Contractor: Engineer:

Winona Mechanical

 

Fran
1210 E. 7th St.
Winona, MN 55987
507 454-3737

Davy Engineering, Inc.

 

Jim Kochie
PO Box 2076
LaCrosse, WI 54729
608 782-3130

 

 

 

 

 

 

 

 

 

 

 

 


  

 


             


ISLAND LAKE CROSSING

 

Who:     HANCO Utilities

 

Where:  Fredenberg Township, Minnesota

 

When:   December, 2008

 

Size:     $65,000.00

Project History #162

 

EBI was awarded a subcontract from HANCO Utiltites for the installation, by directional drilling, of a 4-inch HDPE IPS duct across Island Lake as part of an electrical distribution system for Minnesota Power. EBI completed one shot of 1,200 feet across Island Lake. Water depth on the crossing was up to 25 feet.

 

 

 

Contractor: Engineer:

HANCO Utilities

 

Jeff Cottew
PO Box 55
Lake Nebagomen, WI 54849
218 348-6464

Minnesota Power

 

 

 

 

 

 

 

 

 

 

 

 


  


             

ISLAND LAKE CROSSING

 

Who:     LLB Utility

 

Where:  Fredenberg Township, Minnesota

 

When:   October, 2007

 

Size:     $52,000.00

Project History #137

 

EBI was awarded a subcontract from LLB for the installation, by directional drilling, of a 4-inch HDPE IPS duct across Island Lake as part of an electrical distribution system for Minnesota Power. EBI completed two shots of 1,050 feet to cross Island Lake. Water depth on the crossing was up to 30 feet.

 

 

 

Contractor: Engineer:

LLB Utility

 

Mike MacDonald
1010 Garfield Ave.
Superior, WI 54880
715 392-6224

Minnesota Power

 

 

 

 

 

 

 

 

 

 

 

 


  

 
             

HARRISON BAY WATER MAIN CROSSING

 

Who:     City of Mound

 

Where:  Mound, Minnesota

 

When:   March, 2007

 

Size:     $75,000.00

Project History #123

 

EBI was awarded a contract from the City of Mound for the installation, by directional drilling, of a 12- inch DIPS HDPE water main in Mound, Minnesota. The 12-inch water main was 1,250 feet long and installed in one shot across Harrison Bay on Lake Minnetonka.

 

 

 

 

Owner: Engineer:

City of Mound

 

5341 Maywood Rd.
Mound, MN 55364-1687
952 472-0615

Dan Faulkner
 

Bolton & Menk,
2638 Shadow Lane
Chaska, MN 55318
952 448-8838