HDPE Installation


 

 

             

 

 

SHELBY TO CUT BANK TRANSMISSION MAIN

 

Who:     Downing Construction

 

Where:  Shelby, Montana

 

When:   November-December, 2015

 

Size:     $261,00

Project History #261

 

945’ 16” HDPE IPS Water Main Non-cased bores. 200’ 18” HDPE IPS Water Main Non-cased bores. 120’ 18” FPVC Water Main Non-cased bores. 1,600’ 16” HDPE IPS Water Main Directional Drills.

 

 

Contractor: Engineer:

Downing Construction

 

Randy Downing

32194 Old Hwy 10 S.

Redlands, CA 92373

909 797-7444

 

Nathan Weiseiburger

 

Kadrmas, Lee & Jackson

614 Park Drive S.

Great Falls, MT 59405

406 452-8600

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

SHER PROPERTY DEVELOPMENT

 

Who:     C & L Excavating

 

Where:  Vineland, Minnesota

 

When:   November, 2015

 

Size:     $153,000.00

 

 

Project History #260

 

5,200’ 14” HDPE DIPS Water Main 6 shots.

 

 

Contractor: Engineer:

C & L Excavating

 

Kevin Cox

PO Box 99

St. Joseph, MN 56374

320 363-1221 

 

Mike Nelson

 

Minnesota Engineering

24 3rd Ave. S.

Cold Spring, MN 56320

320 685-5300

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

EAST SIDE INCEPTOR

 

Who:    Switlick & Sons

 

Where:  Medford, Wisconsin

 

When:   October, 2015

 

Size:     $108,000.00

 

 

Project History #258

 

131’ 12” HDPE DIPS Water Main. 606’ 10” HDPE DIPS Water Main. 738’ 8” HDPE IPS Sanitary Sewer. 530’ 8” HDPE DIPS Water Main.

 

 

Contractor: Engineer:

Switlick & Sons

 

Merlin Switlick

5812 Hwy. 97 S.

Athens, WI 54311

715 257-9081

 

Ayres Associates

 

3433 Oakwood Hills Pky

Eau Claire, WI 54701

715 834-3161

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

EDDIE'S RESORT SANITARY SEWER EXTENSION

 

Who:    Veit

 

Where:  Vineland, Minnesota

 

When:   August-September, 2015

 

Size:     $700,000.00

 

 

Project History #257

 

34,000’ 6” HDPE IPS Force Main  Longest shot 1,600’. 5,600’ 4” HDPE IPS Force Main. 1,200’ 10” Casing.

 

 

Contractor: Engineer:

Veit

 

Brett Swymeler

1400 Veit Place

Rogers, MN 55374

763 428-6789

 

Peter Daveils

 

Wenck Associates

1800 Pioneer Ck Center

Maple Plain, MN 55359

763 479-4200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

BIRCH POINT WASTE WATER COLLECTION SYSTEM

 

Who:     Lakehead Trucking

 

Where:  Grand Lake Township, Minnesota

 

When:   October-January, 2015

 

Size:     $188,000.00

 

 

Project History #256

 

8,000’ 1.25” HDPE Services. 3,000’ 3” HDPE Force Main.

 

 

Contractor: Engineer:

Lakehead Trucking

 

Tom Rovinsky

6035 LaVaque Rd.

Duluth, MN 55803

218 391-2425

 

Joe Jurewicz

 

MSA

332 W. Superior St.

Duluth, MN 55802

218 722-3915

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

 

LAKE VERMILION STATE PARK WATER TREATMENT PLANT, WATER IN TAKE LINE

 

Who:     Belair Builders

 

Where:  Tower, Minnesota

 

When:   September, 2015

 

Size:     $60,000.00

Project History #255

 

460’ 4” HDPE Water Intake pipe into Lake Vermilion. 460’ 1.5” HDPE Air Line into Lake Vermilion. Pipes were pulled together.

 

 

Contractor: Engineer:

Belair Builders

 

Jake Droessler

2200 Old Hwy 8 NW

New Brighton, MN 55112

763 355-8430

 

Dan Shaw

 

LHB

21 W. Superior St.

Duluth, MN 55802

218 727-8446

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

MUD LAKE ROAD FORCE MAIN IMPROVEMENTS

 

Who:     USA

 

Where:  Mt. Iron, Minnesota

 

When:   July, 2015

 

Size:     $72,525.00

 

 

Project History #254

 

2,550’ 12” HDPE IPS Force Main 2 shots.

 

 

Contractor: Engineer:

USA

 

Jim Pucel

PO Box 706

Eveleth, MN 55734

218 744-4342

 

Alan Johnson

 

Benchmark Engineering

8878 Main St.

Mt. Iron, MN 55768

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2015 HANDBERG ROAD UTILITY EXTENSION

 

Who:     USA

 

Where:  Crane Lake, Minnesota

 

When:   June-July, 2015

 

Size:     $362,000.00

 

 

Project History #253

 

3,000’ 1.5”, 2” & 3” HDPE Force Main in dirt. 3,100’ 3” HDPE Force Main in Rock.

 

 

Contractor: Engineer:

USA

 

Jim Pucel

PO Box 706

Eveleth, MN 55734

218 744-4342

 

Randy Jennings

 

SEH

1200 25th Ave. S.

St. Cloud, MN 56302

320 229-4378

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

INTERSTATE 94 UTILITY EXTENSION, I-94 CROSSING

 

Who:    Hoffman Construction

 

Where:  St. Michael, Minnesota

 

When:   August, 2015

 

Size:     $132,000.00

 

 

Project History #252

 

900’ 12” HDPE DIPS Casing for 8” HDPE Force Main. 900’ 18” HDPE IPS  Casing for 14” HDPE IPS Water Main.

 

 

Contractor: Engineer:

Hoffman Construction

 

Steve Picha

123 CTH A

Black River Falls, WI 54615

715 284-2512

 

Clark Wicklund

 

Alliant Engineering

233 Park Ave. S.

Minneapolis, MN 55415

612 758-3080

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2015 WEST SIDE WATER MAIN LOOP

 

Who:    TEC

 

Where:  Tomah, Wisconsin

 

When:   May, 2015

 

Size:     $168,000.00

 

 

Project History #251

 

3,600’ 14” HDPE IPS Water Main 4 shots.

 

 

Contractor: Engineer:

TEC

 

Randy Murdoch

PO Box 605

Tomah, WI 54660

608 372-6660

 

Town Country Engineers

 

2912 Marketplace Dr.

Madison, WI 53719

608 273-3350

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2015 GAS MAIN IMPROVEMENTS

 

Who:     Hibbing Excavating

 

Where:  Virginia, Minnesota

 

When:   June-July, 2015

Size:     $635,000.00

 

 

Project History #250

 

5,500’ 12” MDPE Gas Main. 11,100’ 10” MDPE Gas Main.

 

 

Contractor: Engineer:

Hibbing Excavating

 

Brian Burich

3402 15th Ave. E.

Hibbing, MN 55746

218 969-4640

 

Matt Reid

 

SEH

615 9th St. N.

Virginia, MN 55792

218 741-4284

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

ABBOTSFORD LIFT STATION

 

Who:     August Winter & Sons

 

Where:  Abbotsford, Wisconsin

 

When:   September, 2015

 

Size:     $61,000.00

 

 

 

Project History #249

 

1960’ 10” HDPE IPS Force Main 2 shots.

 

 

Contractor: Engineer:

August Winter & Sons

 

Kurt

2323 N. Roemer Rd.

Appleton, WI 54912

920 739-8881

 

Jerry Doriott

 

SEH

10 N. Bridge St.

Chippewa Falls, WI

715 720-6200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

WASHINGTON COUNTY PUBLIC WORKS FORCE MAIN

 

Who:     Washington County

 

Where:  Stillwater, Minnesota

 

When:   July – September, 2015

 

Size:     $512,000.00

 

 

Project History #248

 

18,000’ 3” HDPE Force Main. 17,000’ 1.5” HDPE Duct. Lift Station, Manholes 500’ PVC sanitary sewer.

 

 

Contractor: Engineer:

Washington County

 

Joe Welter

14949 62nd St. N.

Stillwater, MN 55082

651 430-6226

 

Jason Femrite

 

Bolten & Menk

1960 Premier Dr.

Mankato, MN 56001

507 625-4171

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

LEWIS & CLARK RURAL WATER TRANSMISSION, LINE SEGMENT 2

 

Who:    Carstensen Contracting

 

Where:  Luverne, Minnesota

 

When:   March – April, 2015

 

Size:     $240,000.00

 

 

Project History #247

 

370’ 24” HDPE IPS Casing. 170’ 20” Steel Casing. 6,600’ 14” FPVC Water Main Longest shot 1500’.

 

 

Contractor: Engineer:

Carstensen Contracting

 

Steve Olson

PO Box 754

Pipestone, MN 56164

507 825-2026

 

Dennis Odens

 

Banner Associates

409 22nd Ave. S.

Brookings, SD 57006

605 692-6342

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

CAPITAL DRIVE FORCE MAIN & WATER MAIN

 

Who:     PTS Contractors

 

Where:  Brookfield, Wisconsin

 

When:   January, 2015

 

Size:     $58,000.00

 

 

Project History #246

 

1,200’ 12” HDPE DIPS Water Main. 1,200’ 3” HDPE Force Main.

 

 

Contractor: Engineer:

PTS Contractors

 

Greg Joski

4075 Eaton Rd.

Green Bay, WI 54311

920 468-5217

 

John Carlson

 

City of Brookfield

2000 W. Calhoun Rd.

Brookfield, WI 53025

262 787-3919

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2014 WATER MAIN EXTENSIONS PHASE 4, PART 2

 

Who:     Northdale Construction

 

Where:  Alexandria, Minnesota

 

When:   April-July, 2015

 

Size:     $270,000.00

 

 

Project History #245

 

1,200’ 12” ELPVC Water Main. 5,900’ 8” ELPVC Water Main. 5,500’ 1”-2” HDPE Water Services

 

 

Contractor: Engineer:

Northdale Construction

 

Phil Lesner

9760 71st St. NE

Albertville, MN 55301

763 428-4868

 

Bryan Bye

 

Widseth Smith Nolting

610 Filmore St.

Alexandria, MN 56308

320 762-8149

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

 

SOUTH GIBSON STREET LIFT STATION

 

Who:     A-1 Excavating

 

Where:  Medford, Wisconsin

 

When:   December, 2014

 

Size:     $60,000.00

Project History #244

 

120ft 10-inch HDPE DIPS Water Main road crossings. 1,010ft 10-inch HDPE DIPS Water Main one shot. 266ft 12-inch HDPE DIPS Sanitary Sewer at 0.75%.

 

 

Contractor: Engineer:

A-1 Excavating

 

Charlie Storing
PO Box 90
Bloomer, WI
715 568-4141


Mike Stoffel

 

Ayres Associates
3433 Oakwood Hills Pwy
Eau Claire, WI 54701
715 831-7640

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2013 WATER SYSTEM IMPROVEMENTS

 

Who:     Wagner Construction

 

Where:  Big Falls, Minnesota

 

When:   November, 2014

 

Size:     $98,000.00

 

 

Project History #243

 

1,565ft 4-inch HDPE DIPS Water Main. 1,565ft 6-inch HDPE DIPS Water Main. 720ft 1-inch HDPE Water Services. 200ft 20-inch HDPE Casing.

 

 

Contractor: Engineer:

Wagner Construction

 

Mike Brewinski
3151 Hwy 53
International Falls, MN 56649
218 283-3700


Curt Meyer

 

Widseth Smith Nolting
PO Box 2720
Brainerd, MN 56401
218 829-1768

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

KINGSBURY CREEK WATER MAIN REPLACEMENT

 

Who:     Mark Guisfredi

 

Where:  Duluth, Minnesota

 

When:   November, 2014

 

Size:     $250,000.00

 

 

Project History #242

 

340ft 12-inch DIPS Water Main. 360ft 24-inch DIPS Water Main. Two shots across Kingsbury Creek.

 

 

Contractor: Engineer:

Mark Guisfredi

 

City of Duluth
Engineering Division
211 City Hall
Duluth, MN 55802
218 730-5200


Mark Guisfredi

 

City of Duluth
Engineering Division
211 City Hall
Duluth, MN 55802
218 730-5200

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

SOUTH REGIONAL LIFT STATION

 

Who:     Wagner Construction

 

Where:  Burlington, North Dakota

 

When:   September, 2014

 

Size:     $112,000.00

 

 

Project History #240

 

1,330 12-inch HDPE IPS Force Main with one 900ft shot across the De Lacs River. 320’ 18-inch HDPE IPS Casing with a 200ft shot across US Hwy 2.

 

 

Contractor: Engineer:

Wagner Construction

 

Mike Brewinski
3151 Hwy 53
International Falls, MN 56649
218 283-3700


Ackerman Estvold

 

1907 17th St. SE
Minot, ND 58701
701 837-8737

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2014 SE DISTRICT SEWER AND WATER IMPROVEMENTS

 

Who:     Northdale Construction

 

Where:  Corcoran, Minnesota

 

When:   August-September, 2014

 

Size:     $224,000.00

 

 

Project History #239

 

2,400ft 12-inch HDPE DIPS Force Main. 5,500ft 14-inch HDPE DIPS Water Main.

 

 

Contractor: Engineer:

Northdale Construction

 

Tom Wileski
9760 71st St. NE
Albertville, MN
763 428-4868


Ken Torue

 

Wenck Associates
1800 Pioneer Crk Center
Maple Plain, MN 55359
763 479-5125

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

PUMP STATION #2 EMERGENCY FORCE MAIN REPAIR

 

Who:     Clear Lake Sanitary District

 

Where:  Clear Lake, Iowa

 

When:   August, 2014

 

Size:     $184,000.00

 

 

Project History #238

 

1,200ft 14-inch HDPE DIPS Force Main one shot across. Clear Lake in 3 days.

 

 

Contractor: Engineer:

Clear Lake Sanitary District

 

Kevin Moler
5631 235th St.
Clear Lake, IA 50428
641 357-2019


Laurie Twitchell

 

FOX Engineering
414 S 17th St Ste. 107
Ames, IA 50010
515 233-0000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2014 WASTE WATER FACILITIES FORCE MAIN

 

Who:     James Peterson & Sons

 

Where:  Richland Center, Wisconsin

 

When:   September-December, 2014

 

Size:     $492,000.00

 

 

Project History #237

 

7,200ft 20-inch HDPE IPS Force Main across streams, wetlands and roads with 1,200ft as the longest shot.

 

 

Contractor: Engineer:

James Peterson & Sons

 

Steve Koski
PO Box 120
Medford, WI 54451
715 748-3035


Mike Schindhelm

 

Town  Country Engineers
5225 Verona Rd.
Madison, WI 53711
608 273-3350

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

FORCE MAIN & WATER MAIN RIVER CROSSING

 

Who:     James Peterson & Sons

 

Where:  Merrill, Wisconsin

 

When:   July, 2014

 

Size:     $163,000.00

 

 

Project History #236

 

1,500ft 8-inch HDPE DIPS Water Main. 1,500ft 8-inch HDPE DIPS Force Main. Across the Wisconsin River

 

 

Contractor: Engineer:

James Peterson & Sons

 

Steve Koski
PO Box 120
Medford, WI 54451
715 748-3035


Ken Ligman

 

Becher Hoppe
330 4th St.
Wausau, WI, 54402
715 845-8000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

BRAINERD HIGH SCHOOL LOWER SITE IMPROVEMENTS

 

Who:     Peterson Companies

 

Where:  Brainerd, Minnesota

 

When:   August, 2014

 

Size:     $49,000.00

 

 

Project History #235

 

600ft 18-inch HDPE IPS Storm Sewer at 0.5% from athletic field to Mississippi River.

 

 

Contractor: Engineer:

Peterson Companies

 

Luke Kowarsch
8326 Wyoming Trail
Chisago City, MN 55013
651 257-6864


Erica Mucussen

 

Widseth Smith Nolting
PO Box 2720
Brainerd, MN 56401
218 829-1768

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

MEDICINE LAKE TO PLENTYWOOD SCHEDULE 1 PIPELINE

 

Who:     Sandry Construction

 

Where:  Plentywood, Montana

 

When:   September-November, 2013, June-August, 2014

 

Size:     $400,000.00

 

 

Project History #233

 

3,200ft 14-inch CLPVC & FPVC Water Main. 1,000ft 3-inch HDPE Water Main. 2,000ft 2-inch HDPE Water Main. 8,000ft 1.5-inch HDPE Water Service Line. 400ft 6-inch steel casing. 400ft 20-inch steel casing.

 

 

Contractor: Engineer:

Sandry Construction

 

Chuck Sandry
PO Box 507
Bigfork, MT 59991
406 752-2419


Pat Deering

 

DGR
1302 S Union St.
Rock Rapids, IA 51246
712 472-2531

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

MCKENZIE COUNTY 2013 WATER SYSTEM IMPROVEMENTS

 

Who:     Wagner Construction

 

Where:  Arnegard, North Dakota

 

When:   November, 2013 & May 2014

 

Size:     $94,000.00

 

 

Project History #231

 

825ft 12-inch HDPE DIPS Water Main. 755ft 8-inch HDPE DIPS Water Main. 805ft 6-inch HDPE DIPS Water Main. 280ft 2-HDPE IPS Water Service.

 

 

Contractor: Engineer:

Wagner Construction

 

Mike Brewinski
3151 Hwy. 53 Ste. 1
International Falls, MN
218 283-3700


Cory Chorne

 

AE2S
4050 Garden View Dr.
Ste 200
Grand Forks, ND 58201

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

RAW WATER MAIN ON FRANCE AVENUE

 

Who:     Northdale Construction

 

Where:  Edina, Minnesota

 

When:   May, 2014

 

Size:     $43,400.00

 

 

Project History #230

 

1,100ft 12-inch HDPE DIPS Water Main. 

 

 

Contractor: Engineer:

Northdale Construction

 

Tom Wileski
9760 71st St. NE
Albertville, MN
763 428-4868


Chad Millner

 

City of Edina
7450 Metro Blvd.
Edina, MN 55439
952 826-0371

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

SOUTH HEART PRESSURE SEWER MAIN

 

Who:     Wagner Construction

 

Where:  South Heart, North Dakota

 

When:   May, 2014

 

Size:     $33,000.00

 

 

Project History #229

 

2,600ft 8-inch HDPE IPS Force Main with one shot of 1300ft across a golf course and the Heart River.

 

 

Contractor: Engineer:

Wagner Construction

 

Mike Brewinski
3151 Hwy. 53 Ste. 1
International Falls, MN
218 283-3700


Steve Soltys

 

INC Engineers
2674 Sims St. Ste. A
Dickinson, ND 58601
701 483-9222

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

2013 STREET IMPROVEMENTS AND INTERCEPTOR SEWER

 

Who:     James Peterson & Sons

 

Where:  Shell Lake, Wisconsin

 

When:   April, 2014

 

Size:     $43,000.00

 

 

Project History #227

 

855ft 10-inch HDPE IPS Sanitary Sewer.

 

 

Contractor: Engineer:

James Peterson & Sons

 

Steve Koski
PO Box 120
Medford, WI 54451
715 748-3035


Teresa Anderson

 

Teresa Anderson
MSA Services
15 W. Marshall St.
Rice Lake, WI 54868
715 234-1009

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


             

 

 

DOBBINS CREEK CROSSING AND ENERGY PARK FEEDER WATER MAIN

 

Who:     Todd Jorgenson

 

Where:  Austin, Minnesota

 

When:   November, 2013

 

Size:     $190,000.00

 

 

Project History #225

 

1,516ft 16-inch HDPE DIPS Water Main 1-shot. 1,050ft 12-inch HDPE DIPS Water Main in limestone across Dobbins Creek.

 

 

Contractor: Engineer:

Todd Jorgenson

 

Austin Utilities
400 4th St. NE
Austin, MN 55912
507 433-8886


Todd Jorgenson

 

Austin Utilities
400 4th St. NE
Austin, MN 55912
507 433-8886

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

12" RAW WATER MAIN SMSC

 

Who:     Rice Lake Construction

 

Where:  Shakopee, Minnesota

 

When:   November, 2013

 

Size:     $80,000.00

 

Project History #224

 

2,400ft 12-inch HDPE DIPS Water Main. 280ft 8-inch HDPE DIPS Water Main.

 

 

Contractor: Engineer:

Rice Lake Construction

 

Wade Leonard
22360 County Rd. 12
Deerwood, MN 56444
218 546-5519


Andrew Budde

 

Bolton & Menk
12224 Nicollet Ave.
Burnsville, MN 55337
952 890-0509

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

MIDWAY MILE DEVELOPMENT

 

Who:     McCabe Construction

 

Where:  Lake Hallie, Wisconsin

 

When:   September, 2013

 

Size:     $60,000.00

 

Project History #221

 

2,450ft 2-inch HDPE Force Main. 1,350ft 1.5-inch HDPE Force Main. 1,225ft 1.25-inch Force Main.

 

 

Contractor: Engineer:

McCabe Construction

 

David McCabe
PO Box 1769
Eau Claire, WI 54702
715 552-1346


Kevin Oium

 

Cedar Corp.
604 Wilson Ave.
Menominie, WI
715 235-9061

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

2012 WASTE WATER TREATMENT FACILITY IMPROVEMENTS

 

Who:     RJS Construction

 

Where:  Backus, Minnesota

 

When:   August-October, 2013

 

Size:     $900,000.00

 

Project History #220

 

49,000ft 8” DIPS Force Main. 

 

 

Contractor: Engineer:

RJS Construction

 

Lance Lindahl
5300 Stinson Ave.
Superior, WI 54880
715 394-7771


Greg Kimman

 

SHE
416 S 6th St.
Suite 200
Brainerd, MN 56401
218 855-1700

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

SOUTH SIDNEY WATER & SEWER EXTENSION

 

Who:     Williams Civil Division, Inc.

 

Where:  Rhinelander, Wisconsin

 

When:   August-September, 2013

 

Size:     $340,000.00

 

Project History #219

 

3900ft 12-inch FPVC Water Main. 470ft 10-inch FPVC Water Main. 310ft 20-inch steel casing for Water Main. 192ft 18-inch steel casing for Water Main. 140ft 24-inch steel casing for Sanitary Sewer. 3 20-inch HDPE Irrigation Canal Crossings

 

 

Contractor: Engineer:

Williams Civil Division, Inc.

 

Taylor Bickerstaff
2131 Industrial Dr.
Bozemen, MT 59715
406 522-0133


Jordan Mayer

 

Interstate Engineering
PO Box 648
Sidney, MT 59270
406 433-5617

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

FULLER CREEK REGIONAL FORCE MAIN

 

Who:     H Linden & Sons

 

Where:  Rockford, Illinois

 

When:   July, 2013

 

Size:     $90,000.00

 

Project History #217

 

400ft 24-inch HDPE DIPS Force Main. 400ft 12-inch HDPE DIPS Force Main.

 

 

Contractor: Engineer:

H Linden & Sons

 

Steve Linden
722 E. South St.
Plano, IL 630 918-4348


Marcia McCutchan

 

Rezek, Henry,
Meisenheimer & Gende
575 Campus Dr.
Mundelein, IL 60060
547 362-5959

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

MINNESOTA POWER HIBBARD ENERGY CENTER CITY WATER LINE & SEWER UPGRADE

 

Who:     MN Power

 

Where:  Duluth, Minnesota

 

When:   June, 2013

 

Size:     $100,000.00

 

Project History #216

 

1,300ft 10-inch HDPE IPS Water Main. 1,450ft 6-inch HDPE IPS Water Main.

 

 

Contractor: Engineer:

MN Power

 

30 W. Superior St.
Duluth, MN 55802


Luke Schwartz

 

MN Power
30 W Superior St.
Duluth, MN 55802
218 391-4305

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

THE BLUFFS ADDITION 1 & 2

 

Who:     SJ Louis Construction

 

Where:  Minot, North Dakota

 

When:   August, 2013

 

Size:     $225,000.00

 

Project History #215

 

1,900ft 8-inch HDPE IPS Sanitary Sewer 2-shots. 1,200ft 18-inch HDPE IPS Storm Sewer 2-shots. 4,60ft 24-inch HDPE IPS Storm Sewer 1-shot

 

 

Contractor: Engineer:

SJ Louis Construction

 

Dan Spanburg
1351 Broadway St.
Rockville, MN 56369
701 609-4734


Roger Hagen

 

Houston Engineering
1401 21st Ave. N
Fargo, ND 58102
701 237-5065

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

PHASE 1, WATER MAIN IMPROVEMENTS

 

Who:     Jech Excavating

 

Where:  Rochester, Minnesota

 

When:   May, 2013

 

Size:     $30,000.00

 

Project History #214

 

300ft of 18-inch HDPE DIPS Water Main

 

 

Contractor: Engineer:

Jech Excavating

 

Steve Jech
27854 CR-73
Elgin, MN 550932
507 876-5415


Bill Anderman

 

WHKS
2905 S. Broadway
Rochester, MN 55904
507 288-3923

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

HILLCREST WATER MAIN CONNECTOR

 

Who:     Advanced Construction

 

Where:  Waukesha, Wisconsin

 

When:   June, 2013

 

Size:     $330,000.00

 

Project History #213

 

1,640ft 24-inch HDPE DIPS Water Main

 

 

Contractor: Engineer:

Advanced Construction

 

Paul Kultgren
2141 Woodale Ave.
Green Bay, WI
920 434-3978


Michele Klapp-Sullivan

 

Foth Infrastructure
2514 S 102nd St.
Suite 278
West Ellis, WI 53227
414 336-7900

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

WASTE WATER FORCE MAIN FOR PINNACLE FOODS

 

Who:     Rice Lake Construction

 

Where:  Waseca, Minnesota

 

When:   April-May, 2013

 

Size:     $340,000.00

 

Project History #212

 

12,160ft of 16-inch HDPE IPS Force Main.

 

 

Contractor: Engineer:

Rice Lake Construction

 

Wade Lenard
22360 CR 12
Deerwood, MN 56444
218 546-5519


Robert Brown

 

Bolton & Menk
1960 Premier Dr.
Mankato, MN
507 625-4171 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

MCES EMERGENCY REPAIRS

 

Who:     Lametti & Sons

 

Where:  Eagan, Minnesota

 

When:   January, 2013

 

Size:     $60,000.00

 

Project History #210

 

640ft 18-inch HDPE IPS 3 road crossings. 105ft 8-inch HDPE IPS road crossing.

 

 

Contractor: Engineer:

Lametti & Sons

 

Dan Banken
PO Box 477
Hugo, MN 55038
651 426-1380


Lametti & Sons

 

Dan Banken
PO Box 477
Hugo, MN 55038
651 426-1380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

2012 SOUTHEAST WATER & SEWER EXTENSION PROJECT

 

Who:     James Peterson & Sons

 

Where:  Rhinelander, Wisconsin

 

When:   December, 2012

 

Size:     $210,000.00

Project History #209

 

EBI was awarded a subcontract from James Peterson & Sons for the installation, by directional drilling, of 14-inch HDPE pipe as part of the 2012 Southeast Water and Sewer Extension Project in Rhinelander, Wisconsin.  Approximately 8,000 feet was installed with the longest shot approximately 1,400 feet. 

 

 

Contractor: Engineer:

James Peterson & Sons

 

Tom Taylor
PO Box 523
Medford, WI 54451
715 493-7013


Town & Country Engineering

 

Andrew Jacque
5225 Verona Rd
Madison, WI 53711
608 273-3350

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

WAWS MCKENZIE SYSTEM IV EXPANSION PROJECT

 

Who:     Merryman Excavation

 

Where:  McKenzie Cty, North Dakota

 

When:   June, 2012

 

Size:     $700,000.00

Project History #207

 

EBI was awarded a subcontract from Merryman Excavation for the installation, by directional drilling, of various sizes (2-8 inch) of HDPE and CLPVC pipe as part of the WAWS McKenzie System IV Expansion Project in McKenzie County, North Dakota.  More than 300 crossings of roads, petroleum lines, and wetlands have been completed to date.  A 1,600 foot crossing of the Yellowstone River, using 8-inch HDPE, will be completed in 2013.  

 

 

Contractor: Engineer:

Merryman Excavation

 

Ray Braden
1501 Lamb Rd
Woodstock, IL 60098
815 337-1700


AE2S

 

Cory Chorne
1815 Shafer St.
Bismark, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

ACORN RIDGE PUMP STATION PROJECT

 

Who:     Swanberg Construction

 

Where:  Devils Lake, North Dakota

 

When:   September, 2012

 

Size:     $76,000.00

Project History #206

 

EBI was awarded a subcontract from Swanberg Construction for the installation, by directional drilling, of 22-inch HDPE pipe as part of the Acorn Ridge Pump Station Project in Devils Lake, North Dakota.  One shot of 1,000 feet was completed for this project.  

 

 

Contractor: Engineer:

Swanberg Construction

 

Mark Swanberg
250 Central Ave. S.
Valley City, ND 58072
701 845-6946


USACE

 

Wayne Dolan
701 333-2076

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

             

CENTER STREET FORCE MAIN

 

Who:     All Star Construction

 

Where:  Warsaw, Indiana

 

When:   March- April, 2012

 

Size:     $600,000.00

Project History #201

 

EBI was awarded a subcontract from All Star Construction for the installation, by directional drilling, of 24-inch, 18-inch, and 12-inch HDPE pipe as part of the Center Street Force Main Project in Warsaw, Indiana.  A total of 3,400 feet of 24-inch pipe was installed with the longest shot being 1,100 feet.  Two shots totaling 2,600 feet were completed.  A total of 600 feet of 12-inch was also installed.  The shots were compelted either across wetland areas or water bodies. 

 

 

Contractor: Engineer:

All Star Construction

 

Gab Horn
5183 E. State Rd 114-92
Roanoke, IN 46783
260 672-8375


Jones & Henry Engineering

 

John Magsum
2420 Coliseum Blvd
Fort Wayne, IN 46805
260 482-1920

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 


             

WATER MAIN RELOCATION

 

Who:     Red Lake Builders

 

Where:  Redby, Minnesota

 

When:   February, 2012

 

Size:     $120,000.00

Project History #200

 

EBI was awarded a subcontract from Red Lake Builders for the installation, by directional drilling, of a 12-inch HDPE DIPS water main as part of the Water Main Relocation Project by Redby, Minnesota.  One shot through metasedimentary rock was completed.  The bore had a length of 1,100 feet with a depth up to 40 feet.  

 

 

Contractor: Engineer:

Red Lake Builders

 

Gordon Jallen
PO Box 250
Red Lake, MN 56671
218 679-3891


Northern Engineering

 

Mike McFarlan
207 4th Street
Bemidji, MN 56801
218 444-4860

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

             

UNDERGROUND FEEDER TO BURNTSIDE LAKE

 

Who:     Dig America

 

Where:  Ely, Minnesota

 

When:   January, 2012

 

Size:     $100,000.00

Project History #199

 

EBI was awarded a subcontract from Dig America for the installation, by directional drilling, of a 5-inch HDPE electrical conduit as part of the Underground Feeder to Burntside Lake near Ely, Minnesota.  A total of 6,000 feet of 5" HDPE conduit was installed across numerous wetland areas.  The longest shot was 1,765 feet. 

 

 

Contractor: Engineer:

Dig America

 

Delroy Scheeler
25135 22 Ave.
St. Cloud, MN 56301
320 253-3447

KBM, Inc.

 

Greg Horton
405 Bruce Ave.
Grand Forks, ND 58201
701 772-7156

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

WASTE WATER COLLECTION SYSTEM

 

Who:     RJS Construction Group

 

Where:  Parkland, Wisconsin

 

When:   May, 2010 - May, 2011

 

Size:     $900,000.00

Project History #177

 

EBI was awarded a subcontract from RJS Construction Group for the installation, by directional drilling, of various sizes of HDPE force main and services as part of the Waste Water Collection System Project in the Town of Parkland, Wisconsin. Upon completion a total of over 150,000 feet of force main and services will be installed. An additional 500 feet of 8-inch steel casing was also installed across railroad tracks.

 

 

Contractor: Engineer:

RJS Construction Group

 

Nate
PO Box 3068
Superior, WI 54880
218 394-7776

MSA Professional Services

 

Carl Scharfe
301 West 1st Street
Duluth, MN 55802
218 722-3915 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

CANNONBALL PIPELINE PROJECT

 

Who:     McHugh Excavating

 

Where:  Madison, Wisconsin

 

When:   November, 2009

 

Size:     $219,000.00

Project History #170

 

EBI was awarded a subcontract from McHugh Excavating for the installation, by directional drilling, of a 20-inch HDPE DIPS water main as part of the Cannonball Run Pipeline Project in Madison, Wisconsin. A total of 2,750 feet of 20-inch HDPE pipe was installed along an abandoned railroad grade and under a major highway underpass.

 

 

 

Contractor: Engineer: Project Supervisor:

McHugh Excavating

 

Walt Schroeder
W. 7010 Evergreen Way
Onalaska, WI 54650
608 783-1404  

City of Madison - Water Utility

 

Adam Wiederhaeft
1600 Emil St.
Madison, WI 53713
608 266-9121

Terry Anderson

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

COTTAGE GROVE SANITARY FORCE MAIN

 

Who:     Advance Construction

 

Where:  Cottage Grove, Wisconsin

 

When:   Dec, 2008 - Feb. 2009

 

Size:     $355,000.00

Project History #163

 

EBI was awarded a subcontract from Advance Construction for the installation, by directional drilling, of a 18-inch HDPE DIPS for Cottage Grove to MMSD Sanitary Sewer Force Main Project in Cottage Grove, Wisconsin. A total of 8,400 feet of pipe will be installed across wetland areas and in areas of a high water table. EBI completed one shot of 2,000 feet across a wetland.

 

 

 

Contractor: Engineer: Project Supervisor:

Advance Construction

 

Jerry Broekman
2141 Woodale Ave.
Green Bay, WI 54313
920 434-3978

MSA Professional Services

 

Eric Dundee
2901 International Lane
Suite 301
Madison, WI 53704
608 963-0616

Terry Anderson

 

 

 

 

 

 

 

 

 

 

 

 

 

 


    

 

 

             

HIGHLAND NEIGHBORHOOD IMPROVEMENTS

 

Who:     Northwest Asphalt

 

Where:  Edina, Minnesota

 

When:   July, 2008

 

Size:     $64,000.00

Project History #154

 

EBI was awarded a subcontract from Northwest Asphalt for the installation, by directional drilling, of a 12-inch HDPE DIPS water main for the Highland Neighborhood Improvement Project in Edina, Minnesota. A total of 2,284 feet of pipe was installed through a residential area. The longest pull was 1,200 feet.

 

 

 

Contractor: Engineer:

Northwest Asphalt

 

Grant
1451 Stagecoach Rd.
Shakopee, MN 55379
952 445-1003

City of Edina

 

Dept. of Engineering
4801 W. 50th St.
Edina, MN 55424
952 445-1003 

 

 

 

 

 

 

 

 

 

 

 

 

 


  

 
             

NICOLET DRIVE WATER MAIN

 

Who:     PTS Contractors

 

Where:  Scott Township, Wisconsin

 

When:   October, 2008

 

Size:     $134,000.00

Project History #153

 

EBI was awarded a subcontract from PTS Contractors for the installation, by directional drilling, of an 8- inch HDPE DIPS water main for the Nicolet Drive Water Main in Scott Township, Wisconsin. A total of  7,540 feet of pipe was installed through a residential area along Nicolet Driven. The longest pull was 1,600 feet.

 

 

 

Contractor: Engineer:

PTS Contractors

 

Greg Joski
4075 Eaton Road
Green Bay, WI 54311
920 468-5217

Mead & Hunt

 

Scott Brosteau
1345-B North Road
Green Bay, WI 54311
920 468-5217

 

 

 

 

 

 

 

 

 

 

 

 

 

 


  

 

             

JOINT WASTE DISPOSAL FORCE  MAIN

 

Who:     H. Linden & Sons

 

Where:  Elgin, Illinois

 

When:   Nov., 2007 - Jan., 2008

 

Size:     $1,600,000.00

Project History #139

 

EBI was awarded a subcontract from H. Linden & Sons for the installation, by directional drilling, of a  14-inch HDPE DIPS force main and a 8-inch HDPE DIPS force main as part of the Joint Waste Disposal Force Main Project in Elgin, Illinois. EBI completed the installation of a total of 26,000 feet of pipe in approximately 35 days using one crew. To minimize disturbance to the surface EBI elected to pull in the 14-inch and the 8-inch together. The average length of the pulls were approximately 1,000 feet.

 

 

Contractor: Engineer:

H. Linden & Sons

 

Steve Linden
PO Box 344
Yorkville, IL 60506
630 551-7980

Steve Crede

 

Burns & McDonnell
1431 Opus Place
Suite 400
Downers Grove, IL 60515
630 774-1827  

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

WATER MAIN EXTENSION


Who:     Park Construction


Where:  Lake Elmo, Minnesota


When:   August-October, 2006


Size:     $520,000.00 

Project History #110

 

EBI was awarded a subcontract from Park Construction for the installation by directional drilling of a 16-inch DIPS HDPE, a 12-inch DIPS HDPE and an 8-inch DIPS HDPE water mains as part of the Water Main Extension Project in Lake Elmo, Minnesota. A total of 20,912 feet (5,195’ 16”, 5,117’ 12” & 10,600’ 8”) of HDPE pipe was installed through residential areas in the city of Lake Elmo. Using one crew, the installation was completed in 43 working days during August/September/October 2006.

 

 

Contractor: Engineer:

Park Construction

 

Mark Allen
23260 Main St.
Suite 6
Hampton, MN 55031
651 437-2512

Tom Prew

 

TKDA
444 Cedar St.
St. Paul, MN 55101
651 292-4400

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

EASTSIDE SANITARY SEWER EXTENSION

 

Who:    S. J. Louis Construction

 

Where: Sioux Falls, South Dakota

 

When:  March-May, 2006

 

Size:    $360,000.00

Project History #105

 

 

EBI was awarded a subcontract from S. J. Louis Construction for the installation by directional drilling of 18-inch DIPS HDPE sanitary sewer, 18-inch DIPS HDPE force main and 16-inch DI force main as part of the East Side Sanitary Sewer Extension Project in  Sioux Falls, South Dakota. A total of 570’ of 18” sanitary sewer, 6,215’ of 18” force main and 920’ of 16” force main was installed in approximately 40 working days during March-May 2006.

 

 

Contractor: Engineer:

S. J. Louis Construction

Jerry
PO Box 399
Waite Park, MN 56387-0399
320 253-9291

HDR Engineering
 

600 S. Cliff Ave. #106
Sioux Falls, SD 57104
605 977-7740

 

 

 

 

 

 

 

 

 

 

 


 

 

             

VALLEY CITY FORCE MAIN REPLACEMENT

 

Who:     Northern Excavating
 

Where:  Valley City, North Dakota
 

When:   May - June 2002
 

Size:     $240,000.00

               

 

Project History #37

 

EBI was hired as a subcontractor by Northern Excavating to install by directional drilling, 6,000 feet of 18-inch HDPE force main for the city of Valley City, North Dakota. The route of the force main went  beneath the Sheyenne River twice and under Interstate 94. Additionally the force main had to be installed up a very steep hillside (up to 34%). To limit the impact on the city golf course, tennis courts and sports complex directional drilling was chosen as the preferred method. EBI completed the installation of 6,000 feet in six weeks.

 

 

Owner:  Engineer:

City of Valley City

254 2nd Ave. NE
Valley City, ND 58072

Faron Henderson
 

Kadrmas, Lee & Jackson
1010 4th Ave SW
Valley City, ND 58072
701 845-4980