Gravity


 

             

HIGHWAY 200 UTILITIES, LIFT STATION & FORCE MAIN

 

Who:     Merryman Excavation

 

Where:  Killdeer, North Dakota

 

When:   October, 2013

 

Size:     $175,000.00

Project History #222

 

850ft 8-inch CLPVC Sanitary Sewer. 500ft 10” CLPVC Water Main. 1,000ft 6-inch CLPVC Force Main. 510ft 12-inch Steel Casing.

 

 

Contractor: Engineer:

Merryman Excavation

 

Jim Sharpf
1501 Lamb Rd
Woodstock, IL
815 337-1700

Jessica Wagner

 

AE2S
1815 Schafer St
#301
Bismarck, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


  

             

 

EAST UTILITIES LIFT STATION & FORCE MAIN

 

Who:     Merryman Excavation

 

Where:  Killdeer, North Dakota

 

When:   June, 2013

 

Size:     $105,000.00

 

Project History #218

 

1,000ft 10-inch CLPVC Sanitary Sewer. 300ft 10-inch CLPVC Force Main. 375ft 10-inch CLPVC Water Main. 

 

 

Contractor: Engineer:

Merryman Excavation

 

Ray Braden
1501 Lamb Rd
Woodstock, IL 60098
815 337-1700

Jessica Wagner

 

AE2S
1815 Schafer St
#301
Bismarck, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


  


             

WATFORD CITY AREA 5 UTILITIES PROJECT

 

Who:     Merryman Excavation

 

Where:  Watford City, North Dakota

 

When:   July, 2012

 

Size:     $150,000.00

Project History #205

 

EBI was awarded a subcontract from Merryman Excavation for the installation, by directional drilling, of 12-inch and 15-inch FPVC pipe as part of the Watford City Area 5 Utilities Project in Watford City, North Dakota.  A total of approximately 140 feet of 15-inch pipe was installed for a gravity sewer with approximately 4,400 feet of 12-inch pipe installed for a force main. 

 

 

Contractor: Engineer:

Merryman Excavation

 

Ray Braden
1501 Lamb Rd
Woodstock, IL 60098
815 337-1700

AE2S

 

Ken Weber
1815 Shafer St.
Bismarck, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 

 


  

 
             

MOORLAND ROAD, SEWER & WATER PROJECT

 

Who:     Veit & Company

 

Where:  New Berlin, Wisconsin

 

When:   May- June, 2012

 

Size:     $250,000.00

Project History #204

 

EBI was awarded a subcontract from Veit & Company for the installation, by directional drilling, of 36-inch and 16-inch FPVC pipe as part of the Moorland Road, Sewer and Water Project in New Berlin, Wisconsin.  A total of approximately 300 feet of 36-inch pipe was intalled across a stream/wetland area for a gravity sewer.  Approximately 3,000 feet of 16-inch pipe was installed for a water main. 

 

 

Contractor: Engineer:

Veit & Company

 

Jeff Carlson
14000 Veit Place
Rogers, MN 55374
612 490-7220

Strand Associates

 

910 w. Wingra Dr.
Madison, WI 5850
608 251-4843

 

 

 

 

 

 

 

 

 

 

 

 

 


  

 

             

WASTE WATER IMPROVEMENTS

 

Who:     Quam Construction

 

Where:  Lowry, Minnesota

 

When:   May, 2010

 

Size:     $210,000.00

Project History #176

 

EBI was awarded a subcontract from Quam Construction for the installation, by directional drilling, of a 1.25-inch, 4-inch and 6-inch HDPE force mains and a 81" Eagle Lock PVC sanitary sewer as part of the Waste Water Improvement Project in Lowry, Minnesota. A total of 1,922 feet of 1.25-inch, 10,487 feet of 4-inch and 1,715 feet of 6-inch force main pipe was installed. The installation of the 8-inch gravity sewer totaled 2,358'.

 

 

Contractor: Engineer:

Quam Construction

 

Terry
PO Box 48
Wilmer, MN 56201
320 235-3344

Design Tree Engineering

 

Jeremy Anderson
2510 Broadway St. South
Alexandria, MN 56308
320 762-1290

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

MANLIUS WASTE WATER COLLECTION SYSTEM

 

Who:     Fischer Excavating, Inc.

 

Where:  Manlius, Illinois

 

When:   April, 2010

 

Size:     $111,000.00

Project History #173

 

EBI was awarded a subcontract from Fischer Excavating for the installation, by directional drilling, of an 8-inch FPVC and a 6-inch FPVC sanitary sewer as part of the Waste Water Collection System Project in Manlius, Illinois. A total of 3,535 feet of 8-inch FPVC gravity sanitary sewer and 160 feet of 6-inch FPVC gravity sewer was installed in the Village of Manlius.

 

 

 

Contractor: Engineer:

Fischer Excavating, Inc.

 

Mark
1567 Heine Rd.
Freeport, IL 61032
815 233-3232

McClure Engineering

 

John Kusek
1138 Columbus St.
Ottawa, IL 61350
815 433-3232

 

 

 

 

 

 

 

 

 

 

 

 


  


             

SHERWOOD FOREST IMPROVEMENT PROJECT

 

Who:     Machtemes Construction

 

Where:  Minnetonka, Minnesota

 

When:   June & October, 2009

 

Size:     $162,000.00

Project History #169

 

EBI was awarded a subcontract from Machtemes Construction for the installation, by directional drilling, of a 20-inch HDPE DIPS storm sewer as part of the Sherwood Forest Improvement Project in Minnetonka, Minnesota. A total of 1,025 feet of 20-inch HDPE was installed in the residential  neighborhood of Sherwood Forest.

 

 

 

 

Contractor: Engineer: Project Supervisor:

Machtemes Construction

 

Chuck Machtemes
PO Box 275
Waconia, MN 55387
952 657-2283

City of Minnetonka

 

Chris Smith
14600 Minnetonka Blvd.
612 760-4387

Terry Anderson 

 

 

 

 

 

 

 

 

 

 

 

 

 


  


             

LANDON AVENUE SANITARY SEWER & WATER MAIN IMPROVEMENTS

 

Who:     Swallow Construction

 

Where:  Warrenville, Illinois

 

When:   July, 2009

 

Size:     $300,000.00

Project History #164

 

EBI was awarded a subcontract from Swallow Construction for the installation of a ductile iron water main and a Certa-Lok PVC sanitary sewer in a residential area of Warrenville, Illinois. A total of 2,213’ of 8-inch and 2,228’ of 10-inch ductile iron water main was installed by directional drilling. The second part of the project was to install 4,568’ of 8-inch Certa-Lok PVC (CLPVC) sanitary sewer by directional drilling.

 

 

 

Contractor: Engineer:

Swallow Contruction

 

4250 Lacey Rd.
Downers Grove, IL 60515
630 512-9900

James J. Benes & Associates

 

950 Warrenville Rd
Suite 101
Lisle, IL 60532
630 719-7570

 

 

 

 

 

 

 

 

 

 

 

 


  


             

TURNER STREET PUMP STATION

 

Who:     Gridor Construction

 

Where:  Marshalltown, Iowa

 

When:   April, 2008

 

Size:     $252,000.00

Project History #146

 

EBI was awarded a subcontract from Gridor Construction for the installation, by directional drilling, of a 12-inch, an 18-inch & a 24-inch HDPE IPS sanitary siphon for the Turner Street Pump Station Project in Marshalitown, Iowa. A total of 1,200 feet of pipe was installed.

 

 

 

 

Contractor: Engineer:

Gridor Construction

 

Lori Peters
3990 27th St. SE
Buffalo, MN 55313
763 559-3734

FOX Engineering

 

Lance Aldrich
1601 Golden Aspen Dr.
Ames, IA 50010
515 233-0000

 

 

 

 

 

 

 

 

 

 

 

 


  

 
             

STORM SEWER & WATER MAIN

 

Who:     City of Edina

 

Where:  Edina, Minnesota

 

When:   September, 2007

 

Size:     $220,000.00

Project History #134

 

EBI was awarded a contract from the City of Edina for the installation, by directional drilling, of a 12-inch HDPE DIPS water main and a 24-inch HDPE IPS storm sewer for the 70th & France Storm Sewer and Water Main Project in Edina, Minnesota. To reduce surface impacts as well as to minimize disruptions to the Galleria Shopping Mall both the water main (873’) and the storm sewer (835’) were installed in one pull. The storm sewer was installed at a grade of 0.5 percent in depths up to 20 feet.

 

 

Owner: Engineer: Project Supervisor:

City of Edina

 

4801 W. 50th St.
Edina, MN 55424
952 826-0449

Derek Schmidt

 

WSB & Assocs.
701 Xenia Ave. S.
Suite 300
Minneapolis, MN 55416
763 541-4800

Terry Anderson