FPVC Installation


 

             

E. SUNSET DRIVE FORCE MAIN IMPROVEMENTS

 

Who:     PTS Contractors

 

Where:  Waukesha, Wisconsin

 

When:   October, 2015

 

Size:     $68,000.00

Project History #259

 

1,125’ 14” FPVC Force  Main 1 shot.

 

 

Contractor: Engineer:

PTS Contractors

 

Greg Joski

4075 Eaton Rd.

Green Bay, WI 54311

920 468-5217

 

Nassar Shabi

 

City of Waukesha

130 Delafield St.

Waukesha, WI 53188

262 524-3591

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

NW WATER TRANSMISSION MAIN

 

Who:     Wilson Brothers

 

Where:  Sheridan, Wyoming

 

When:   April, 2014

 

Size:     $165,000.00

Project History #226

 

1,780ft 16-inch FPVC Water Main in slope failure area at depths up to 20 feet.  

 

 

Contractor: Engineer:

Wilson Brothers

 

Lane Wilson
980 Rd 7
Cowley, WY 82420
307 548-6559


Jeff Rosenlund

 

DOWL HKM
445 Lincoln St.
Lander, WY 82520
307 332-3285

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



             

 

WAWS PHASE II TRANSMISSION MAIN PROJECT

 

Who:     Merryman Excavation

 

Where:  Watford City, North Dakota

 

When:   October- November, 2012

 

Size:     $465,000.00

 

Project History #208

 

EBI was awarded a subcontract from Merryman Excavation for the installation, by directional drilling, of 16-inch, 12-inch, and 8-inch FPVC pipe as part of the WAWS Phase II Transmission Main Project in Watford City, North Dakota.  A total of approximately 6,000 feet of 16-inch water main was installed with the longest shot around 1,500 feet.  3,400 feet of 80-inch and 850 feet of 12-inch was installed.  

 

 

Contractor: Engineer:

Merryman Excavation

 

Ray Braden
1501 Lamb Rd
Woodstock, IL 60098
815 337-1700


AE2S

 

Russ Sorenson
1815 Shafer St.
Bismark, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

WAWS PHASE II WATER TRANSMISSION PROJECT

 

Who:     Ryan Construction

 

Where:  McKenzie Cty, N. Dakota

 

When:   June- August, 2012

 

Size:     $650,000.00

Project History #203

 

EBI was awarded a subcontract from Ryan Contracting for the installation, by directional drilling, of 20-inch FPVC pipe as part of the WAWS Phase II Water Transmission Watford City Segment Project in McKenzie County, North Dakota.  A total of approximately 9,000 feet of 20-inch pipe was installed with the longest shot being about 1,400 feet.  The bores consisted of road and highway crossings as well as crossings of wetland areas. 

 

 

Contractor: Engineer:

Ryan Contracting

 

Tom Ryan
PO Box 246
Elko, MN 55020
952 894-3200

AE2S

 

Chris Saxon
1815 Schafer St.
Bismark, ND 58501
701 221-0530

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

WEST END WATER PROJECT

 

Who:     Mountain View Building

 

Where:  Cowley, Wyoming

 

When:   April, 2012

 

Size:     $240,000.00

Project History #202

 

EBI was awarded a subcontract from Mountain View Building for the installation, by directional drilling, of 10-inch FPVC pipe as part of the West End Water Project in Cowley, Wyoming.  A total of 8,200 feet of 10-inch pipe was installed with the longest shot being 1,100 feet. 

 

 

Contractor: Engineer:

Mountain View Building

 

Jason Spielman
237 N Main St.
Sheridan, WY 82801
307 675-1822

Pryor Mountain Engineering

 

William Bridges
PO Box 671
Cowley, WY 82420
307 548-9913

 

 

 

 

 

 

 

 

 

 

 

 


 

 

             

SANGAMON WATER TRANSMISSION MAIN

 

Who:     Village of Chatham

 

Where:  Chatham, Illinois

 

When:   June - November 2010

 

Size:     $2,200,000.00

Project History #178

 

EBI was awarded a contract from the Village of Chatham for the installation, by directional drilling, of 20-inch and 18-inch FPVC, 12-inch and 10-inch CLPVC water mains as part of the Water Transmission Main Project in and around the Village of Chatham, Illinois. A total of 2,670' of 20-inch and 12,043' of 18-inch FPVC water main was installed. A total of 1,860' of 12-inch CLPVC and 2,535' of 10-inch CLPVC water main was installed. Of the total footage of 18 and 20-inch pipe 3,641' was installed through limestone. The longest bore was 1,200' and was 18-inch pipe.

 

 

Owner: Engineer:

Village of Chatham

 

Terry Burke
116 East Mulberry
Chatham, IL 62629
217 652-1902

Greene & Bradford, Inc.

 

Gary Kutzman
3501 Constitution Dr.
Springfield, IL 62711
217 825-8523

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

             

RAW WATER TRANSMISSION MAIN

 

Who:     Merryman Excavation

 

Where:  Pittsfield, Illinois

 

When:   December, 2009 - February 2010

 

Size:     $800,000.00

Project History #171

 

EBI was awarded a subcontract from Merryman Excavation for the installation, by directional drilling, of a 20-inch FPVC casing and a 14-inch FPVC water main water as part of the Raw Water Transmission Main Project Contracts B1 and B2 near Pittsfield, Illinois. A total of 3,274 feet of 20-inch and 1,785 feet of 14-inch FPVC pipe was installed across creeks and wetlands. Additional 932 feet of the 20-inch pipe was installed in Limestone bedrock.

 

 

Contractor: Engineer:

Merryman Excavation

 

Ray Braden
1501 Lamb Rd.
Woodstock, IL 61032
815 337-1700

MECO Engineering Co.

 

John Hummel
116 South Madison
Pittsfield, IL 62363
217 285-2550

 

 

 

 

 

 

 

 

 

 

 

 


  

 

 

             

INDUSTRIAL PARK SEWER  PROJECT

 

Who:     S. J. Louis Construction

 

Where:  Stevens Point, Wisconsin

 

When:   July-August, 2009

 

Size:     $295,000.00

Project History #168

 

EBI was awarded a subcontract from S. J. Louis Construction for the installation, by directionaldrilling, of a 18-inch FPVC force main and 3-1.25- inch innerduct lines for the Industrial Park Sewer Project in Stevens Point, Wisconsin. A total of 3,400 feet of 18-inch FPVC was installed along Patch Street including a 1,600’ crossing of the Plover River.

 

 

 

Contractor: Engineer:

S. J. Louis Construction

 

Marc Hinz
P0 Box 459
Rockville, MN 56369-0459
320 253-9291

Sandra Kimmler

 

Donuhue & Associates
3311 Weeden Creek Rd.
Sheboygan, WI 53081
920 208-0296

 

 

 

 

 

 

 

 

 

 

 

 


  

 

Project History #150

             

EASTSIDE WATER DISTRIBUTION

 

Who:     Moistad Excavating

 

Where:  Minot, North Dakota

 

When:   June, 2008

 

Size:     $114,000.00

 

 

EBI was awarded a subcontract from Moistad Excavating for the installation, by directional drilling, of a 16-inch FPVC water main for the Eastside Water  Distribution System in Minot, North Dakota. A total of 1,580 feet was installed with one shot of 1,500 feet  completed in three days in a business district of the city.

 

 

 

Contractor:  Engineer:

Moistad Excavating

 

Drew Molstad
705 South 48th St.
Grand Forks, ND 58201
701 746-5474

David O’Shea
Houston Engineering
3712 Lockport St.
Bismarck, ND 58503
701 323-0200